(403) 689-1599

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers
  • More
    • Home
    • About Us
    • Our Proven Process
    • Services
    • Brownfield/As-built
    • Greenfield
    • Contact
    • Careers

(403) 689-1599

  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
Valor EPC

Harmattan Stabilizer Upgrades

Revamp and 3D Design for Aging Sour Gas Plant

In response to multiple heat exchanger failures and persistent fouling issues in a 1960's vintage condensate stabilizer at a midstream sour gas plant, our team undertook a comprehensive approach to address these challenges:


  • Conducted a thorough assessment of various heat exchanger technologies to determine the most suitable option for the high fouling service.
  • Utilized advanced 3D laser scanning technology to capture precise data of the congested facility area that required upgrades, ensuring accuracy in design.
  • Identified decommissioned equipment that needed removal to create space for the new equipment.
  • Seamlessly integrated the new design into the 3D laser scan model, allowing for detailed reviews with operations and construction teams to resolve clashes and ensure a conflict-free design before construction commenced.
  • Provided construction support to tackle on-site challenges as they arose, particularly in cases where underground infrastructure was inadequately documented on existing drawings.


The project yielded impressive outcomes:


  • A design that garnered full support from all client stakeholders, fostering effective collaboration and commitment to project success.
  • The implementation of carefully chosen heat exchangers designed to prolong equipment lifespan and minimize cleaning requirements.
  • Adoption of dual 100% exchangers in some services to reduce downtime during maintenance.
  • Successful utilization of 3D laser scanning technology, leading to reduced field and engineering time while delivering an exceptionally accurate design.

 

Our success story extends beyond cost management:


  • Outpaced initial service timelines for our client, achieved through meticulous equipment and vendor selection.
  • Seamlessly incorporated an additional heat exchanger into the project scope while keeping within the original budget constraints.


This achievement underscores our commitment to delivering exceptional engineering solutions that prioritize efficient timelines, budget compliance, and the fulfillment of evolving project demands.

our proven process

Copyright © 2018 Valor EPC - All Rights Reserved.

  • What Sets Us Apart
  • Why We Do It
  • Unique 4-step process
  • Construction Services
  • Pipeline Projects
  • Contact
  • Blog Entries