(403) 689-1599

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers
  • More
    • Home
    • About Us
    • Our Proven Process
    • Services
    • Brownfield/As-built
    • Greenfield
    • Contact
    • Careers

(403) 689-1599

  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
Valor EPC

Pump Station Projects:

Pump Station Expansion

Addition of two 20,000BBL crude tanks, two 900HP booster pumps, three 6,000HP mainline pumps, two 12" measurement skids, one 16" measurement skid, one 20" measurement skid, tie in to new 20" pipeline, increased line sizes from existing tanks to booster pumps, cathodic protection,  a new MCC to service the new 4160 V pumps, ATCO substation and distribution upgrade, existing tank berm modifications, associated piperack and piping modifications.

Pump Station Design

Installation of crude and C5+ storage tanks (20,000BBL each), booster pump skid (2x 100HP), two injection pump skids (250HP each), discharge measurement skid (2x 4", 600# coriolis) and inlet meter building (6 bays for incoming pipelines).  Included civil and structural works to support new equipment and pipe rack.  Also, new MCC building, associated cabling and instrumentation.

Copyright © 2018 Valor EPC - All Rights Reserved.