(403) 689-1599

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers
  • More
    • Home
    • About Us
    • Our Proven Process
    • Services
    • Brownfield/As-built
    • Greenfield
    • Contact
    • Careers

(403) 689-1599

  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
Valor EPC

Detailed Design Construction & Startup Support

Project Background:

  • Midstream sour gas plant needed egress for their acid gas as the current egress was no longer feasible 
  • Acid Gas Injection well drilled near the facility to facilitate the new egress
  • Facilities (new and modification of existing) and pipelines were designed/built to support new egress

Solution & Execution:

  • Determine the water content, composition and temperatures ranges for the acid gas. This was highly variable and caused the greatest complication in the design
  • Based on the design conditions, determine what kind of conditioning would be required for the acid gas
  • Due to the length of pipeline and potential low flow rate of the acid gas, glycol dehydration was selected to condition the gas
  • Pipeline and wellsite design along with required regulatory support 
  • Major equipment and severe service acid gas valves were bid, evaluated and ordered
  • Complete mechanical tie-in package was developed, bid, evaluated and awarded for execution during a scheduled plant turnaround
  • Class III cost estimate produced. Built up from construction quantities and solid equipment bids. This secured full project funding
  • Existing equipment modifications (Amine, Compression, etc.) designed

Final Results:

  • Project was completed on budget, which included some unforeseen existing facility issues that were resolved as part of the original project budget
  • Acid Gas injection system works as designed. Valor assisted with some operational issues during start-up to ensure operation was working effectively 

Project Highlights:

  

  

  1. Complicated process design was successfully integrated into the existing facility to ensure the wide range of potential operating conditions could be satisfied
  2. Excellent quality construction work packages were produced that provided clear direction to the contractors with minimal requests for information in the field
  3. Valor assisted the client with a few post start-up issues involving tweaks that needed to be made on equipment outside of the project scope

our proven process