(403) 689-1599

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers
  • More
    • Home
    • About Us
    • Our Proven Process
    • Services
    • Brownfield/As-built
    • Greenfield
    • Contact
    • Careers

(403) 689-1599

  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Our Proven Process
  • Services
  • Brownfield/As-built
  • Greenfield
  • Contact
  • Careers

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
Valor EPC

“We had a project come in with very little time allotted for engineering and fabrication.  Our resources were already swamped and we needed some help on the engineering and regulatory fronts.  Valor EPC jumped right into the design and regulatory approval for 3 different packages.  They had it done in less than 8 weeks for the one price we all agreed was acceptable.   We would highly recommend Valor to those looking for a flexible, fast moving team that knows how to work with fabricators to get things done."


Barry Hall/Lexine Web

Founder/Project Manager – Hall Technologies Ltd.

Butane Offload and Blending Skids

Project, Mechanical, Process and Instrumentation Engineering

 

Project Background:


  • Packaged equipment fabricator had received multiple orders, taxing their engineering capacity
  • Urgent timelines were required to meet end-user demands
  • Three (3) different package designs required project, mechanical, process and instrumentation engineering input into fabrication
  • Engineer stamped drawings were required for fabrication and regulatory applications


Solution & Execution:


  • Initial collaborative discussion between Valor EPC and packager to confirm scope and offer a lump-sum commercial agreement to provide packager with price certainty on this scope
  • Dedicated Valor team assigned to produce design and review fabrication drawings and requirements
  • Project Engineer from Valor visited packager facility on frequent basis to ensure input to design and address concerns in a timely manner
  • Produced missing deliverables in proactive manner to ensure regulatory approval was in place
  • Actively discussed alternative design approaches to minimize scope and fabrication time, resulting in a quicker delivery
  • Assisted with review of packager created documents and helped packager create in house documents for future use
  • Coordinated structural skid and pipe support designs with Valor structural team and fabricators chosen CAD designer


Final Results:


  • Detailed Design complete for all three (3) packages in less than 8 weeks
  • Regulatory approval received in less than 2 weeks
  • Valor engineering review and collaboration with the packager suggested a necessary change to piping and pump sizing to produce a better overall package pressure drop.  The changes as a result were able to be implemented prior to fabrication saving shop and site rework
  • Scope delivered within expected time frame at agreed to lump sum cost

Project Highlights:


  1. Lump Sum Engineering.
  2. Three designs completed in less than eight weeks.
  3. Error in original pump sizing caught and corrected to save time and money in the field.

our proven process

Copyright © 2018 Valor EPC - All Rights Reserved.

  • What Sets Us Apart
  • Why We Do It
  • Unique 4-step process
  • Construction Services
  • Pipeline Projects
  • Contact
  • Blog Entries